Terracog Global Positioning Systems: Conflicts And

1157 Words5 Pages
Written Analysis and Communication 1 TerraCog Global Positioning Systems: Conflicts and Communication on Project Arial WAC Assignment 2 Submitted to Prof. Rohini Patel Submitted by Vishnu Meena Roll No-111061 On 25 November 2011 INDIAN INSTITUTE OF MANAGEMENT UDAIPUR Letter of Memorandum Date: 20-03-2008 To, Richard Fiero, President Tony Barren, Director of Production Ed Pryor, VP of sales Allen Roth, Director of Design & Development Becky Timmons, CFO Harold Whistler, VP of Design & Development From: Emma Richardson, Executive Vice President Here is the report on the problem of launch of the product and price of the product. I recommend launching the product at zero margin and then redesign to reduce the product. Executive summary: Designing Department of TerraCog is come up with a product called ‘Aerial’. Price estimated by the designing department is too high. They have four options either to go with the price of designing team or to launch the product at zero margin and redesign it to reduce cost or delay the launch by 3 to 6 months or by abandon the project. On the basis of these options launching the product at zero margin and redesign it to reduce the cost is the optimum recommendation. Word used: 85 words Content Page: 1. Situation Analysis …………………………………………………… 4 2. The problem / Objective…………………………………………….. 4 3. The options…………………………………………………………... 5 4. Criteria for Evaluation …………………………………………….. 5 5. Evaluation of Option………………………………………………... 5 6. Recommendation……………………………………………………. 6 7. Action Plan…………………………………………………………… 6 Situation Analysis: TerraCog
Open Document