Lowell Sluggers Case Study

5309 Words22 Pages
Request for Proposal for Lowell’s Sluggers Practice Field Project No. 0001 Solicitation No. 1001-0001 Humberto Arreola b.arreola@yahoo.com PM598 – March 2013 TABLE OF CONTENTS 1. INSTRUCTIONS TO BIDDER 3 1.1. General Description of Work 3 1.2. What Must Be Included with Bid 4 1.3. Schedule of Bid Period Activities 5 1.4. Location of Work 6 1.5. Pre-Bid Meeting 7 1.8. Sealed Bid Requirements 8 1.9. Basis for Bid Evaluation 8 1.10. Ethical Standards 9 1.11. Responsibility for Surety Bonds 9 1.12. Proposal Format 9 1.14. Letter of Acknowledgment 14 2. DESCRIPTION OF WORK 14 2.1. Engineering Contracts……………………………………………………………………………...15 2.2. Construction Contracts……………………………………………………………………………..15…show more content…
Ethical Standards The Contractors are expected to maintain the highest ethical standards. General contractor will not contact any member of Humberto Arreola staff or other general contactors being solicited in this RFP. No gifts of any type are allowed from contractors and or vendors by and team bylaws. Any violations of unethical standards will be grounds for immediate dismissal from this RFP. 1.11. Responsibility for Surety Bonds The individual contractor that is selected will be required to furnish a performance bond, and the bond will be in he amount of equal to the total amount of the contract, written by a surety licensed to do business in the State of Indiana. This performance bond shall be provided to Mr. Humberto Arreola, owner of Lowell’s Sluggers, within ten (10) days after execution of this contract document and bid award. The bond may/will be secured through the general contractor’s usual sources. 1.12. Proposal Format A. FIRM INFORMATION Limit section to seven (6)…show more content…
Submit examples of project records and reports prepared by the firm. E.4 Describe the estimating and cost control methods used by the firm during both the Preconstruction Phase and the Construction Phase of a project. Include examples, from the projects first described above, of successful constructability analysis and value engineering efforts to maintain project budgets without sacrificing overall project quality. E.5 Describe the firm’s approach to quality assurance/quality control during both the Preconstruction Phase and the Construction Phase of a project. What is the firm’s practice regarding the preparation, monitoring and completion of the punch-list/closeout of a project? Include a description of how the firm plans to address warranty issues and other post-construction
Open Document