Acct 200 Week 3

722 Words3 Pages
3,200 3,200 349 3,200 3,200 3,200 2,400 200 3,000 3,851 200 200 200 200 10 1 200 200 200 2,900 Bathroom 5 7 Common Room 4,900 200 3,000 200 150 800 1,400 800 200 Office GROUND FLOOR GENERAL NOTES 1. This drawing is copyright 2. All work to be carried out in accordance with Local Authority regulations 3. provide damp proof course (D.P.C.) under walls 4. P.V. indicates permanent ventilationse 5. All dimensions are to be checked on site by the contracter and any discrepancies , errors or omissions reported before commencing on site 6. All measurements in mm 7. All Reinforced concrete work is to be in accordance with S.E's detail 8. All sanitary work to be in accordance with MoH rules and regulationes 9. All inspection chambers in driveway to have heavy duty covers 10. All drainage passing under the building or driveway to be encased in concrete 11. Refer to Mechanical & Electrical drawings for service installations DATE SIGN REVISION 200 Cleaner's 1,100 CLIENT: PROJECT: LEAD CONSULTANT: ARCHITECT: drawing title : ALIYAH JOY PROJECT Proposed Building at Kiteezi Vistro Uganda Limited P.o. Box 5205, Kampala, Uganda Tel.: +256 075…show more content…
This drawing is copyright 2. All work to be carried out in accordance with Local Authority regulations 3. provide damp proof course (D.P.C.) under walls 4. P.V. indicates permanent ventilationse 5. All dimensions are to be checked on site by the contracter and any discrepancies , errors or omissions reported before commencing on site 6. All measurements in mm 7. All Reinforced concrete work is to be in accordance with S.E's detail 8. All sanitary work to be in accordance with MoH rules and regulationes 9. All inspection chambers in driveway to have heavy duty covers 10. All drainage passing under the building or driveway to be encased in concrete 11. Refer to Mechanical & Electrical drawings for service
Open Document