METHOD STATEMENT FOR DISMANTLING OF EXISTING TRANSMISSION LINE A. INTRODUCTION a. As a direct result of the construction of the proposed project, some of the existing single 132kV overhead transmission line between Kota Tinggi and Tebrau PMU, becomes redundant and can be dismantled. b. Routing of the proposed double 132kV overhead transmission line closely follows that of the existing132kV line in many locations. As a result there are several locations where the new line crosses over the existing 132kV line. c. The existing 132kV line must remain operational wherever possible to ensure a secure electricity supply until the proposed overhead transmission line can be energised. B. GENERAL SAFETY a. Whenever dismantling is taking place, barricade the area and place proper signage if the area is accessible to public. b. Workers must use required PPE and firmly secure to the tower structure while working on tower. c. To ensure that material is properly arranged at site at all times to avoid tripping or injury to workers. d. Dismantling work shall be discontinued during thunderstorms and heavy winds. C. DISMANTLING OF WIRES AND FITTINGS a. Dismantling of the conductors takes place only when the protection measures have been put in place. b. Before starting to dismantle the conductors, protection measures consisting of scaffolding and nets would be erected over obstacles such as major roads and overhead distribution lines. c. Dismantling of Conductors should be done by sections of 2 tension towers (S, M, T type towers). d. Conductors to be dismantled should be secured with clamps and tower should be provided with proper backstays e. Conductors are to be dismantled first; lower conductor followed by middle and top conductors, finally followed by earth wire. f. Rollers (running out blocks) are erected at each tower position and the conductor is unclamped
Open Document