Dundee Water Phase 1 Hia Report

18426 WordsNov 8, 201274 Pages
Phase 1 Heritage Impact Assessment Report: Dundee Bulk Water Supply Project, Endumeni Local Municipality, Umzinyathi District, KwaZulu-Natal Prepared for iBhongo Consulting cc 71 Fifth Avenue Morningside Durban 4000 Telephone Thembela Nxumalo 031 324 2200 Fax 031 324 2222 Thembela@ibhongo.co.za Prepared by eThembeni Cultural Heritage Elizabeth Wahl and Len van Schalkwyk Box 20057 Ashburton 3213 Pietermaritzburg Telephone 033 326 1136 / 082 655 9077 / 082 529 3656 Facsimile 086 672 8557 thembeni@iafrica.com 10 October 2012 Phase 1 Heritage Impact Assessment of Dundee Bulk Water Supply Project, KwaZulu-Natal MANAGEMENT SUMMARY eThembeni Cultural Heritage was appointed by iBhongo Consulting cc to undertake a Phase 1 Heritage Impact Assessment of a proposed water supply project, as required by the National Environmental Management Act 107 of 1998 as amended, in compliance with Section 38 of the National Heritage Resources Act 25 of 1999 as amended. HERITAGE RESOURCE DESCRIPTIONS AND SIGNIFICANCE Site Heritage resource type number Places, buildings, structures and equipment 1 2 3 4 5 6 7 8 9 10 11 12 13 Talana Museum, Battlefield and Heritage Park Smith family farming remains Talana Anthracite Mine adit Small stock enclosure Possible stone walling Battle of Talana Hill ‘skans’ Stone walled stock enclosure Stone walled stock enclosure Stone walled stock enclosure Homestead Stone walled stock enclosure Stone pile Stone walled stock enclosure Heritage significance Grade I National Heritage Site or Grade II Provincial/Heritage Landmark High local significance for historic value Medium local significance for historic value Low local significance for historic value Low local significance for historic value High local significance for historic value Low local significance for historic value Low local significance for historic value Low local

More about Dundee Water Phase 1 Hia Report

Open Document