Netw310 Week 4

311 Words2 Pages
NETW310 Week 4 Lab Report NETW310, March 30, 2014 Lab #4, Lab Report Each answer is worth seven points. Use a red colored font for you answers. Place the answers below the questions. 1. May we dig a trench across the city street shown in this lab? Yes we can, we just have to follow all the rules 2. Who issues the permit for this work? The Department of Engineering Services of the city 3. Must we submit construction plans to the city? Yes 4. Once the permit is issued, how long must we wait before commencing work? The permittee will have to give the Department of Engineering Services a minimum notice of 48 hours prior starting the work. 5. How deep must the cable be buried? It must be 42 inches under the top of the pavement. 6. What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched? The backfill material needs to be compacted in lifts of loose depth that does not exceeding 8 inches and compacted to at least 95% of Standard Proctor Density at optimum moisture content, +/- two percentage points, as determined by ASTM D698 or provide the City with suitable advanced technology compaction testing methods, as approved by the Director 7. Is the company we hire to do the work required to be registered in any way? Yes, the company must be certified to work in public rights-of- way. 8. What is a right-of-way? Anything that goes beyond the property that you own or that is controlled by the customer is considered a right of way. 9. When is interference with traffic flow allowed? Interference is allowed between 8:30am to 4:30pm. 10. During what hours may work not be done? Between 10:00pm to

More about Netw310 Week 4

Open Document