After lining up the wires to the standard I then trimmed them so they were even and I made sure the outer jacket was inside the RJ-45 connector. I inserted the wires into the RJ-45 connector so they lined up with the proper pins in the connector. I inserted the cable and the RJ-45 connector into the crimping tool and I ensured that the wires did not slip from the pins. I crimped the RJ-45 connector to the cable and then I repeated these steps for the other end of the cable. The last thing that needed to be done was to test the cable to make sure that the cable worked correctly.
Use the 1.0mm opening for 1.6mm fiber. Also trim the Kevlar to the ‘C’ length using the electrician style scissors. * Using the marker pen and the template card provided, measure and mark the buffer strip length as shown on the template. * Using the buffer strippers, strip off the buffer in at least two pieces. * Using a dry, lint-free wipe; Remove any remnants of the protective coating on the fiber after stripping the buffer.
I would then untwist the wires and put them in the correct color order that I need. Then I would flatten out the wires and in one hand hold my RJ-45 connector and then with the other hand feed the wires into the connector. This is usually pretty simple with the way the connectors are made, and they are also usually clear. After I’m sure that the wires are in the connector all the way, and in the right order, I would use a wire crimper to clamp[ the wires securely in to the connector. Coaxial cable- For the COAXIAL CABLE I would do the same first few steps by getting the correct length of cable that I would need.
Place all removed components into antistatic bags for safekeeping. o 10 Remove the screws securing the motherboard to the system case. Pull the motherboard from the case. Remove the foil panel (I/O panel)
Now that you have everything out of the way we can get started on tuning this engine up. First you start with number one cylinder, which is on the driver side front of the engine, remove the rubber boot from the first spark plug and mark it with a marker showing its number one next take your socket and ratchet and unscrew the plug from the side of the head. The plugs we choose are pregapped so we wont have to gap them carefully install the new plug in to he head make sure you don’t hit the electrode on the tip of the spark plug tighten it to approximately 35 inch pounds. Next follow the plug wire that you removed back to the distributer and remover the rubber boot from that point match that wire with one of the new ones as close as possible mark that wire as cylinder 1 and mark the distributer cap where you took that one off. I like to continue on the odd side of the vehicle so we’ll head to cylinder number 3.
The aspirator was turned to medium high, and then the copper was poured onto wetted filter paper. Using distilled water to remove all copper from the beaker. Once completely on filter paper 6mL of acetone was added to the copper to help dry it out. The filter paper was then removed and set down to dry completely. Once dry the filter paper was weighed with the copper on it and subtracted from the original weight to see the amount of copper left after
First you will need to remove the motherboard from the plastic and place it on an antistatic mat to stop static electricity. Then you will want to place the processor into the socket for it on the motherboard. You will need to match the missing pin on the CPU to the missing pin on the socket for the CPU. Then presses down on it gently in tell it’s in place. Then close the load lever to secure it into place.
The purpose of this step was to remove (extract) most of the water that has dissolved in the ether layer. 2) The aqueous layer was drained and the solution discarded in the sink. 3) The ether layer was poured out the top of the separatory funnel into a clean, dry Erlenmeyer flask. 4) Several scoops of anhydrous Mg SO4 were added and the solution swirled. The MgSo4 absorbed the last traces of water the ether solution.
If the Client is also playing an instrument during the Session, it allows for greater concentration on each part, leading to fewer mistakes and better results. Once the Session begins, each track recorded has to have the signal flow and level checked. Usually if the Client just plays through a song in “warm up”, the Engineer can get a good signal level, requiring only minor “tweaks” before the recording process begins. When everybody is ready to record, the Engineer will say “Silence in the House”. At that point, he will “record arm” the track(s) to be recorded, and push the “big red button”.
The Ark of the Covenant The Ark of the Covenant was the only object found in the Holy of Holies, and it was the most sacred object of the Tabernacle. The Ark of the Covenant was made out of acacia wood and was about 45 inches long, 27 inches wide, and 27 inches high. It was overlaid with pure gold inside Barry 3 and out and had a gold molding all around it. Four gold rings were also made, for its four feet, two rings on each side. Poles of acacia wood were also made and overlaid with gold.