Again use plenty of tape. e) Place the egg into the open end of the box and use the remaining cut out as the top piece. Tape the box closed. 5) Crumple up any remaining pieces poster board and place them in the bottom of the cone. This will aid in cushioning the fall and weighting the bottom of the cone.
Unit 6 Exercise 1 Connector Installations Twisted-pair cable: Step 1: Measure the cable you want to put ends on and trim it to the proper length using the cable cutter. Step 2: Use the cable stripper to strip about 1.5" of the jacket from the end of the cable. Then, rotate the stripper around the cable twice. This will cut through the jacket. Step 3: Remove the stripper from the cable and pull the trimmed jacket from the cable, exposing the inner conductors.
Scotch has been around since 1930, so we have perfected the Grime be Gone! What exactly is the grime be gone? The grime be gone is a roll of adhesive paper centered on our highly durable plastic centers. This allows you to get 360 degrees of cleaning action! After using one whole sheet to it maximum ability, simply peel that sheet off and start a new one!
Use the 1.0mm opening for 1.6mm fiber. Also trim the Kevlar to the ‘C’ length using the electrician style scissors. * Using the marker pen and the template card provided, measure and mark the buffer strip length as shown on the template. * Using the buffer strippers, strip off the buffer in at least two pieces. * Using a dry, lint-free wipe; Remove any remnants of the protective coating on the fiber after stripping the buffer.
A TOUCH OF ASIA Decoart Americana Antique Maroon, Heritage Brick, Antique Gold, Titanium White, Warm White, Asphaltum, Spice Pink, Santa Red, Lamp Black To begin: Apply texture crackle in overlapping patches until entire surface is covered. Let dry and then sand lightly. Applying the Background Color: Pour a small amount of glazing medium into a shallow bowl. Cut or tear a blue shop towel in fourths. Take one of the pieces and crumple it into a small pillow-like ball.
The amount of soda ash to use varies so it is a good idea to read the directions before adding it. After your shirt has soaked, it needs to be wrung out very well so the shirt can soak up the dye. I usually wring it out and let it air dry for a few minutes while I set up a good work area. Your area of tie dying needs to be covered in plastic. I like to tape it to the table or workspace so it does not move.
M. Pt: I put gloves on and inserted acetamide into the end of the 2nd capillary and moved the powder towards the end of the tube and repeated it until it was ¾ quarters down. I used a rubber band to attach the tube to a
Next, will be to take one equal sheet from each brand and place it over a bowl and use an eye dropper filled with water. Drops will be squeezed onto the paper towel one at a time until the water starts to leak into the container below. Each drop will be counted up to the point where the water leaks into
LCL) c. What is contained (e.g. Control or spray 1 etc.) 3. Immediately sticky tape up the control dish to prevent any bacteria from further entering 4. Using one of the cotton buds, swab an area of the tap that is most commonly used (e.g.
Put the wire cutters down. Plug in the soldering iron as that is heating up, take the wire stripers and strip the wire by about ¾”. There will be two wires at this point, proceed by picking up the shrink-wrap and putting it on the wire. Separate the two wires; both of them should have copper exposed. Pick up the razorblade lightly, press down on each wire, moving with the grain along the wire to remove the insulation; do this in till no more comes off.